Infrastructure

Water—Service through the Charleston Commission of Public Works (via 10”and 16” water mains along Palmetto Parkway).

Wastewater/Sewer—Service supplied by the North Charleston Sewer District (via half-million gallon capacity system installed on-site— 8”-12” lines). A high volume pump station (650,000 GPD) centrally located next to the main north/south connector that is supplying sewer for the total tract. There is also a 8” gravity sewer line located within PCP.

 

Electric Power— Service available from SCE&G (South Carolina Electric and Gas).

Natural Gas—Service available from SCE&G (via 6” steel gas line along Palmetto Parkway (90 lbs. psi).

 

Telecommunications—Digital switching capability provides access to ISDN services plus a wide array of fiber optic voice, video and data services.